Peach Bottom nuclear power plant is a nuclear power station in United States with 2 operating units totalling 2,824 MW gross. The site has 3 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 2 | BWR | BWR-4 (Mark 1) | 1,412 | 1974 | |
| Unit 3 | BWR | BWR-4 (Mark 1) | 1,412 | 1974 | |
| Unit 1 | Retired | HTGR | - | 42 | 1967 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Peach Bottom nuclear power plant 2
| Reactor type | Boiling water reactor (BWR) |
|---|---|
| Model | BWR-4 |
| Size class | Large |
| Gross capacity | 1,412MW |
| Net capacity | 1,300MW |
| Thermal output | 3,951MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | GE Vernova Hitachi Nuclear Energy |
| Owner | Exelon Corp50% PSEG Power Inc50% |
| Operator | Exelon Generation |
| Construction start | 31 Jan 1968 |
|---|---|
| First criticality | 16 Sep 1973 |
| Grid connection | 18 Feb 1974 |
| Commercial operation | 5 Jul 1974 |
Live status, outage record and fuel chain for Peach Bottom nuclear power plant 2
Peach Bottom nuclear power plant 3
| Reactor type | Boiling water reactor (BWR) |
|---|---|
| Model | BWR-4 |
| Size class | Large |
| Gross capacity | 1,412MW |
| Net capacity | 1,331MW |
| Thermal output | 3,951MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | GE Vernova Hitachi Nuclear Energy |
| Owner | Exelon Corp100% PSEG Power Inc |
| Operator | Exelon Generation |
| Construction start | 31 Jan 1968 |
|---|---|
| First criticality | 7 Aug 1974 |
| Grid connection | 1 Sep 1974 |
| Commercial operation | 23 Dec 1974 |
Live status, outage record and fuel chain for Peach Bottom nuclear power plant 3
Peach Bottom nuclear power plant 1 Retired
| Reactor type | High-temperature gas reactor (HTGR) |
|---|---|
| Model | not disclosed |
| Size class | Small |
| Gross capacity | 42MW |
| Net capacity | 40MW |
| Thermal output | 115MWt |
| Enrichment | 8–20% U-235, frequently HALEU |
| NSSS vendor | not on record |
| Owner | Exelon Generation Co LLC100% |
| Operator | Exelon Generation |
| Construction start | 1 Feb 1962 |
|---|---|
| First criticality | 3 Mar 1966 |
| Grid connection | 27 Jan 1967 |
| Commercial operation | 1 Jun 1967 |
| Permanent shutdown | 1 Nov 1974 |
Peach Bottom nuclear power plant in context
By gross operating capacity Peach Bottom nuclear power plant is the 4th largest of 54 operating nuclear sites in the United States, holding 3% of the country's operating capacity, and ranks 45th of 172 worldwide.
Its operating units started up in 1974; the median unit is 52.0 years old, older than the median of 45.0 in the United States.
The 3 units with both construction and grid dates on record took 5.0 to 6.6 years (median 6.1) from construction start to grid connection; the median across all reactors connected in the 1970s is 5.4 years.
The nearest other tracked nuclear sites are Hope Creek nuclear power plant (71 km), Salem nuclear power plant (71 km) and Limerick nuclear power plant (78 km).
2 operating units are rated differently now from their design net capacities: Unit 2 +22.1% and Unit 3 +25.0%.
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 1962 | 1967 | 5.0 | 5.0 (1960s) |
| Unit 2 | 1968 | 1974 | 6.1 | 5.4 (1970s) |
| Unit 3 | 1968 | 1974 | 6.6 | 5.4 (1970s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Hope Creek nuclear power plant | United States | 71 km | 1.2 |
| Salem nuclear power plant | United States | 71 km | 2.5 |
| Limerick nuclear power plant | United States | 78 km | 2.4 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Peach Bottom nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Peach Bottom Township, Pennsylvania, United States |
|---|---|
| Coordinates | 39.7589, -76.2687 |
| Elevation | about 50 mabove sea level |
| Setting | 27.5 km from the sea |
| Region | Northern America |
| Units by status | Operating: 2 Retired: 1 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Exelon Generation Co LLC Exelon Corp PSEG Power Inc |
|---|---|
| Operators | Exelon Generation |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data