River Bend nuclear power plant 1
River Bend nuclear power plant 1 is a boiling water reactor unit at River Bend nuclear power plant in United States rated at 1,016 MW gross. It is operating. Commercial operation began 16 Jun 1986.
| Reactor type | Boiling water reactor (BWR) |
|---|---|
| Model | BWR-6BWR-6 (Mark 3) in the source |
| Size | Largeabove 300 MWe |
| Coolant | Light water |
| Moderator | Light water |
| Gross capacity | 1,016MW |
| Net capacity (reference) | 967MW |
| Net capacity (design) | 966MW |
| Thermal output | 3,091MWt |
| NSSS vendor | GE Vernova Hitachi Nuclear Energyall vendors |
| Typical enrichment | 3–5% U-235 |
| Site | River Bend nuclear power plant |
|---|---|
| Unit | 1 |
| Country | United States |
| Owner | Entergy Gulf States Inc100% |
| Operator | Entergy Nuclear Operations |
| Coordinates | 30.7570, -91.3327 |
- Framatome BWR fuel assemblies
- Global Nuclear Fuel BWR fuel assemblies
- Westinghouse Electric Company BWR fuel assemblies
United States runs 31 operating units on BWR fuel. 3 fabricators are documented for it. Global Nuclear Fuel and Westinghouse Electric Company are based in United States. Country exposure
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Timeline
- 25 Mar 1977Construction start
- 31 Oct 1985First criticality
- 3 Dec 1985Grid connection
- 16 Jun 1986Commercial operation
Other units at River Bend nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| River Bend nuclear power plant 2 | Cancelled | 934 |
| River Bend nuclear power plant 3 | Cancelled | 1,520 |
Other BWR-6 (Mark 3) units
6 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| Clinton nuclear power plant 1 | United States | 1,098 | |
| Cofrentes nuclear power plant | Spain | 1,102 | |
| Grand Gulf nuclear power plant 1 | United States | 1,500 | |
| Perry nuclear power plant 1 | United States | 1,303 | |
| Grand Gulf nuclear power plant 2 | United States | Cancelled | 1,250 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-29
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data