Pickering nuclear power plant

Pickering nuclear power plant is a nuclear power station in Canada with 4 operating units totalling 2,160 MW gross. The site has 8 units on record in total.

Operating6Under construction1Retired1circle area ∝ site capacity Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.
Units on record
8
Operating
4
Operating capacity
2,160MW
Country

Units

UnitStatusTypeModelGross MWOnline
Unit B5 Operating PHWR CANDU 500B 540 1983
Unit B6 Operating PHWR CANDU 500B 540 1984
Unit B7 Operating PHWR CANDU 500B 540 1985
Unit B8 Operating PHWR CANDU 500B 540 1986
Unit A1 Retired PHWR CANDU 500A 542 1971
Unit A2 Retired PHWR CANDU 500A 542 1971
Unit A3 Retired PHWR CANDU 500A 542 1972
Unit A4 Retired PHWR CANDU 500A 542 1973

Unit by unit

Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.

Pickering nuclear power plant B5 Operating

Reactor typePressurised heavy water reactor (PHWR)
ModelCANDU 500B
Size classLarge
Gross capacity540MW
Net capacity516MW
Thermal output1,744MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorAtkinsRéalis (Candu Energy)
OwnerOntario Power Generation Inc100%
OperatorOntario Power Generation
Construction start1 Nov 1974
First criticality23 Oct 1982
Grid connection19 Dec 1982
Commercial operation10 May 1983

Live status, outage record and fuel chain for Pickering nuclear power plant B5

Pickering nuclear power plant B6 Operating

Reactor typePressurised heavy water reactor (PHWR)
ModelCANDU 500B
Size classLarge
Gross capacity540MW
Net capacity516MW
Thermal output1,744MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorAtkinsRéalis (Candu Energy)
OwnerOntario Power Generation Inc100%
OperatorOntario Power Generation
Construction start1 Oct 1975
First criticality15 Oct 1983
Grid connection8 Nov 1983
Commercial operation1 Feb 1984

Live status, outage record and fuel chain for Pickering nuclear power plant B6

Pickering nuclear power plant B7 Operating

Reactor typePressurised heavy water reactor (PHWR)
ModelCANDU 500B
Size classLarge
Gross capacity540MW
Net capacity516MW
Thermal output1,744MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorAtkinsRéalis (Candu Energy)
OwnerOntario Power Generation Inc100%
OperatorOntario Power Generation
Construction start1 Mar 1976
First criticality22 Oct 1984
Grid connection17 Nov 1984
Commercial operation1 Jan 1985

Live status, outage record and fuel chain for Pickering nuclear power plant B7

Pickering nuclear power plant B8 Operating

Reactor typePressurised heavy water reactor (PHWR)
ModelCANDU 500B
Size classLarge
Gross capacity540MW
Net capacity516MW
Thermal output1,744MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorAtkinsRéalis (Candu Energy)
OwnerOntario Power Generation Inc100%
OperatorOntario Power Generation
Construction start1 Sep 1976
First criticality17 Dec 1985
Grid connection21 Jan 1986
Commercial operation28 Feb 1986

Live status, outage record and fuel chain for Pickering nuclear power plant B8

Pickering nuclear power plant A1 Retired

Corrected against a later source

Permanently shut down on 1 October 2024 ahead of the Pickering B refurbishment programme, after the GNPT record was last researched in May 2024.

status: operating → retired · IAEA Power Reactor Information System, reactor record PICKERING-1 · verified 2026-09-06

Permanently shut down on 1 October 2024 ahead of the Pickering B refurbishment programme, after the GNPT record was last researched in May 2024.

permanent_shutdown: not set → 2024-10-01 · IAEA Power Reactor Information System, reactor record PICKERING-1 · verified 2026-09-06

Permanently shut down on 1 October 2024 ahead of the Pickering B refurbishment programme, after the GNPT record was last researched in May 2024.

retirement_year: not set → 2024 · IAEA Power Reactor Information System, reactor record PICKERING-1 · verified 2026-09-06

Reactor typePressurised heavy water reactor (PHWR)
ModelCANDU 500A
Size classLarge
Gross capacity542MW
Net capacity515MW
Thermal output1,744MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorAtkinsRéalis (Candu Energy)
OwnerOntario Power Generation Inc100%
OperatorOntario Power Generation
Construction start1 Jun 1966
First criticality25 Feb 1971
Grid connection4 Apr 1971
Commercial operation29 Jul 1971
Permanent shutdown1 Oct 2024

Pickering nuclear power plant A2 Retired

Reactor typePressurised heavy water reactor (PHWR)
ModelCANDU 500A
Size classLarge
Gross capacity542MW
Net capacity515MW
Thermal output1,744MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorAtkinsRéalis (Candu Energy)
OwnerOntario Power Generation Inc100%
OperatorOntario Power Generation
Construction start1 Sep 1966
First criticality15 Sep 1971
Grid connection6 Oct 1971
Commercial operation30 Dec 1971
Permanent shutdown28 May 2007

Pickering nuclear power plant A3 Retired

Reactor typePressurised heavy water reactor (PHWR)
ModelCANDU 500A
Size classLarge
Gross capacity542MW
Net capacity515MW
Thermal output1,744MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorAtkinsRéalis (Candu Energy)
OwnerOntario Power Generation Inc100%
OperatorOntario Power Generation
Construction start1 Dec 1967
First criticality24 Apr 1972
Grid connection3 May 1972
Commercial operation1 Jun 1972
Permanent shutdown31 Oct 2008

Pickering nuclear power plant A4 Retired

Corrected against a later source

Permanently shut down on 31 December 2024, after the GNPT record was last researched in May 2024.

status: operating → retired · IAEA Power Reactor Information System, reactor record PICKERING-4 · verified 2026-09-06

Permanently shut down on 31 December 2024, after the GNPT record was last researched in May 2024.

permanent_shutdown: not set → 2024-12-31 · IAEA Power Reactor Information System, reactor record PICKERING-4 · verified 2026-09-06

Permanently shut down on 31 December 2024, after the GNPT record was last researched in May 2024.

retirement_year: not set → 2024 · IAEA Power Reactor Information System, reactor record PICKERING-4 · verified 2026-09-06

Reactor typePressurised heavy water reactor (PHWR)
ModelCANDU 500A
Size classLarge
Gross capacity542MW
Net capacity515MW
Thermal output1,744MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorAtkinsRéalis (Candu Energy)
OwnerOntario Power Generation Inc100%
OperatorOntario Power Generation
Construction start1 May 1968
First criticality16 May 1973
Grid connection21 May 1973
Commercial operation17 Jun 1973
Permanent shutdown31 Dec 2024

Pickering nuclear power plant in context

By gross operating capacity Pickering nuclear power plant is the 3rd largest of 4 operating nuclear sites in Canada, holding 16% of the country's operating capacity, and ranks 79th of 172 worldwide.

Its operating units started up between 1983 and 1986; the median unit is 41.5 years old, older than the median of 41.0 in Canada.

The 8 units with both construction and grid dates on record took 4.4 to 9.4 years (median 6.6) from construction start to grid connection; the median across all reactors connected in the 1980s is 7.3 years.

The nearest other tracked nuclear sites are Darlington nuclear power plant (28 km), Darlington New nuclear power plant (30 km) and Robert Emmett Ginna nuclear power plant (154 km).

Build time by unit

UnitConstruction startGrid connectionYearsFleet median, same decade
Unit A1196619714.85.4 (1970s)
Unit A2196619715.15.4 (1970s)
Unit A3196719724.45.4 (1970s)
Unit A4196819735.15.4 (1970s)
Unit B5197419828.17.3 (1980s)
Unit B6197519838.17.3 (1980s)
Unit B7197619848.77.3 (1980s)
Unit B8197619869.47.3 (1980s)

Nearest tracked nuclear sites

How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.

Site detail
LocationPickering, Ontario, Canada
Coordinates43.8107, -79.0689
Elevationabout 95 mabove sea level
SettingOn the shore of a large lake, 1.9 km from the water
RegionNorthern America
Units by status
Operating: 4
Retired: 4

Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.

Owners & operators
Owners
Ontario Power Generation Inc
Operators
Ontario Power Generation

Put this plant on your own page: embed a card, or compare it with another plant.