Greifswald nuclear power plant

Greifswald nuclear power plant is a nuclear site in Germany with 9 units on record. None is currently operating.

Pre-construction1Shelved1Retired6circle area ∝ site capacitydashed = approximate position Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.
Units on record
9
Operating
0
Operating capacity
not disclosed
Country

Units

UnitStatusTypeModelGross MWOnline
Unit 1 Retired PWR VVER V-230 440 1974
Unit 2 Retired PWR VVER V-230 440 1975
Unit 3 Retired PWR VVER V-230 440 1978
Unit 4 Retired PWR VVER V-230 440 1979
Unit 5 Retired PWR VVER V-213 440 1989
Unit 6 Cancelled PWR VVER V-213 440 -
Unit 7 Cancelled PWR VVER V-213 440 -
Unit 8 Cancelled PWR VVER V-213 440 -
Unit 9 Cancelled PWR VVER V-213 440 -

Unit by unit

Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.

Greifswald nuclear power plant 1 Retired

Reactor typePressurised water reactor (PWR)
ModelVVER V-230
Size classLarge
Gross capacity440MW
Net capacity408MW
Thermal output1,375MWt
Enrichment3–5% U-235
NSSS vendorRosatom
OwnerEnergiewerke Nord GmbH100%
OperatorEnergiewerke Nord
Construction start1 Mar 1970
First criticality15 Dec 1973
Grid connection17 Dec 1973
Commercial operation12 Jul 1974
Permanent shutdown18 Dec 1990

Accident on record: Greifswald cable fire, 1975-12-07, INES level 3, serious incident.

Greifswald nuclear power plant 2 Retired

Reactor typePressurised water reactor (PWR)
ModelVVER V-230
Size classLarge
Gross capacity440MW
Net capacity408MW
Thermal output1,375MWt
Enrichment3–5% U-235
NSSS vendorRosatom
OwnerEnergiewerke Nord GmbH100%
OperatorEnergiewerke Nord
Construction start1 Mar 1970
First criticality3 Dec 1974
Grid connection23 Dec 1974
Commercial operation16 Apr 1975
Permanent shutdown14 Feb 1990

Greifswald nuclear power plant 3 Retired

Reactor typePressurised water reactor (PWR)
ModelVVER V-230
Size classLarge
Gross capacity440MW
Net capacity408MW
Thermal output1,375MWt
Enrichment3–5% U-235
NSSS vendorRosatom
OwnerEnergiewerke Nord GmbH100%
OperatorEnergiewerke Nord
Construction start1 Apr 1972
First criticality16 Oct 1977
Grid connection24 Oct 1977
Commercial operation1 May 1978
Permanent shutdown28 Feb 1990

Greifswald nuclear power plant 4 Retired

Reactor typePressurised water reactor (PWR)
ModelVVER V-230
Size classLarge
Gross capacity440MW
Net capacity408MW
Thermal output1,375MWt
Enrichment3–5% U-235
NSSS vendorRosatom
OwnerEnergiewerke Nord GmbH100%
OperatorEnergiewerke Nord
Construction start1 Apr 1972
First criticality22 Jul 1979
Grid connection3 Sep 1979
Commercial operation1 Nov 1979
Permanent shutdown2 Jun 1990

Greifswald nuclear power plant 5 Retired

Reactor typePressurised water reactor (PWR)
ModelVVER V-213
Size classLarge
Gross capacity440MW
Net capacity408MW
Thermal output1,375MWt
Enrichment3–5% U-235
NSSS vendorRosatom
OwnerVEB KKW "Bruno Leuschner"100%
OperatorEnergiewerke Nord
Construction start1 Dec 1976
First criticality26 Mar 1989
Grid connection24 Apr 1989
Commercial operation1 Nov 1989
Permanent shutdown24 Nov 1989

Greifswald nuclear power plant 6 Cancelled

Reactor typePressurised water reactor (PWR)
ModelVVER V-213
Size classLarge
Gross capacity440MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichment3–5% U-235
NSSS vendorRosatom
Cancelled1991
Milestonesno dates on record

Greifswald nuclear power plant 7 Cancelled

Reactor typePressurised water reactor (PWR)
ModelVVER V-213
Size classLarge
Gross capacity440MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichment3–5% U-235
NSSS vendorRosatom
Cancelled1991
Milestonesno dates on record

Greifswald nuclear power plant 8 Cancelled

Reactor typePressurised water reactor (PWR)
ModelVVER V-213
Size classLarge
Gross capacity440MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichment3–5% U-235
NSSS vendorRosatom
Cancelled1991
Milestonesno dates on record

Greifswald nuclear power plant 9 Cancelled

Reactor typePressurised water reactor (PWR)
ModelVVER V-213
Size classLarge
Gross capacity440MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichment3–5% U-235
NSSS vendorRosatom
Cancelled1991
Milestonesno dates on record

Greifswald nuclear power plant in context

The 5 units with both construction and grid dates on record took 3.8 to 12.4 years (median 5.6) from construction start to grid connection; the median across all reactors connected in the 1970s is 5.4 years.

No other nuclear site with an exact position in this dataset lies within 300 km.

Build time by unit

UnitConstruction startGrid connectionYearsFleet median, same decade
Unit 1197019733.85.4 (1970s)
Unit 2197019744.85.4 (1970s)
Unit 3197219775.65.4 (1970s)
Unit 4197219797.45.4 (1970s)
Unit 51976198912.47.3 (1980s)

How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.

Site detail
LocationMecklenburg-Vorpommern, Germany
Coordinates54.1416, 13.6634
Elevationabout 25 mabove sea level
SettingOn the sea coast, 1.7 km from the water
RegionWestern Europe
Units by status
Retired: 5
Cancelled: 4

Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.

Owners & operators
Owners
Energiewerke Nord GmbH
VEB KKW "Bruno Leuschner"
Operators
Energiewerke Nord

Put this plant on your own page: embed a card, or compare it with another plant.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.