Zhangzhou nuclear power plant
Zhangzhou nuclear power plant is a nuclear power station in China with 2 operating units totalling 2,424 MW gross. The site has 6 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1-1 | PWR | HPR-1000 | 1,212 | 2025 | |
| Unit 1-2 | PWR | HPR-1000 | 1,212 | 2026 | |
| Unit 2-3 | Under construction | PWR | HPR-1000 | 1,214 | 2028 |
| Unit 2-4 | Under construction | PWR | HPR-1000 | 1,214 | 2029 |
| Unit 3-5 | Announced | PWR | - | 1,150 | - |
| Unit 3-6 | Announced | PWR | - | 1,150 | - |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Zhangzhou nuclear power plant 1-1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | HPR-1000 |
| Size class | Large |
| Gross capacity | 1,212MW |
| Net capacity | 1,126MW |
| Thermal output | 3,180MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | CNNC Zhangzhou Energy |
| Construction start | 16 Oct 2019 |
|---|---|
| Grid connection | 28 Nov 2024 |
| Commercial operation | 1 Jan 2025 |
Zhangzhou nuclear power plant 1-2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | HPR-1000 |
| Size class | Large |
| Gross capacity | 1,212MW |
| Net capacity | 1,126MW |
| Thermal output | 3,190MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | CNNC Zhangzhou Energy |
| Construction start | 4 Sep 2020 |
|---|---|
| First criticality | 3 Nov 2025 |
| Grid connection | 22 Nov 2025 |
| Commercial operation | 1 Jan 2026 |
Zhangzhou nuclear power plant 2-3 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | HPR-1000 |
| Size class | Large |
| Gross capacity | 1,214MW |
| Net capacity | 1,129MW |
| Thermal output | 3,180MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | CNNC Zhangzhou Energy |
| Construction start | 22 Feb 2024 |
|---|---|
| Commercial operation | 1 Jan 2028 |
Zhangzhou nuclear power plant 2-4 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | HPR-1000 |
| Size class | Large |
| Gross capacity | 1,214MW |
| Net capacity | 1,129MW |
| Thermal output | 3,180MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | CNNC Zhangzhou Energy |
| Construction start | 27 Sep 2024 |
|---|---|
| Commercial operation | 1 Jan 2029 |
Zhangzhou nuclear power plant 3-5 Announced
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | not disclosed |
| Size class | Large |
| Gross capacity | 1,150MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | not on record |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | CNNC Zhangzhou Energy |
| Milestones | no dates on record |
|---|
Zhangzhou nuclear power plant 3-6 Announced
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | not disclosed |
| Size class | Large |
| Gross capacity | 1,150MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | not on record |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | CNNC Zhangzhou Energy |
| Milestones | no dates on record |
|---|
Zhangzhou nuclear power plant in context
By gross operating capacity Zhangzhou nuclear power plant is the 12th largest of 18 operating nuclear sites in China, holding 4% of the country's operating capacity, and ranks 64th of 172 worldwide.
Its operating units started up between 2025 and 2026; the median unit is 0.5 years old, younger than the median of 10.0 in China.
The 2 units with both construction and grid dates on record took 5.1 to 5.2 years (median 5.2) from construction start to grid connection; the median across all reactors connected in the 2020s is 7.7 years.
The nearest other tracked nuclear sites are Lufeng nuclear power plant (210 km), Fuqing nuclear power plant (266 km) and Taipingling nuclear power plant (286 km).
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1-1 | 2019 | 2024 | 5.1 | 7.7 (2020s) |
| Unit 1-2 | 2020 | 2025 | 5.2 | 7.7 (2020s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Lufeng nuclear power plant | China | 210 km | - |
| Fuqing nuclear power plant | China | 266 km | 6.7 |
| Taipingling nuclear power plant | China | 286 km | 1.2 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Zhangzhou nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Lieyu, Fujian, China |
|---|---|
| Coordinates | 23.8289, 117.4949 |
| Elevation | about 10 mabove sea level |
| Setting | On the sea coast, 0.6 km from the water |
| Region | Eastern Asia |
| Units by status | Operating: 2 Under construction: 2 Announced: 2 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | China National Nuclear Power Co Ltd |
|---|---|
| Operators | CNNC Zhangzhou Energy |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data