Xudapu nuclear power plant

Xudapu nuclear power plant is a nuclear site in China with 6 units on record. None is currently operating.

Operating1Under construction1circle area ∝ site capacity Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.
Units on record
6
Operating
0
Operating capacity
not disclosed
Country

Units

UnitStatusTypeModelGross MWOnline
Unit 1-1 Under construction PWR AP-1000 1,290 2028
Unit 1-2 Under construction PWR AP-1000 1,290 2029
Unit 2-3 Under construction PWR VVER-1200/V-491 1,274 2027
Unit 2-4 Under construction PWR VVER-1200/V-491 1,274 2028
Unit 3-5 Announced PWR - 1,250 -
Unit 3-6 Announced PWR - 1,250 -

Unit by unit

Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.

Xudapu nuclear power plant 1-1 Under construction

Reactor typePressurised water reactor (PWR)
ModelAP-1000
Size classLarge
Gross capacity1,290MW
Net capacity1,000MW
Thermal output2,905MWt
Enrichment3–5% U-235
NSSS vendorWestinghouse Electric Company
OwnerChina National Nuclear Power Co Ltd100%
OperatorCNNC Liaoning Nuclear Power
Construction start15 Nov 2023
Commercial operation1 Jan 2028

Xudapu nuclear power plant 1-2 Under construction

Reactor typePressurised water reactor (PWR)
ModelAP-1000
Size classLarge
Gross capacity1,290MW
Net capacity1,000MW
Thermal output2,905MWt
Enrichment3–5% U-235
NSSS vendorWestinghouse Electric Company
OwnerChina National Nuclear Power Co Ltd100%
OperatorCNNC Liaoning Nuclear Power
Construction start17 Jul 2024
Commercial operation1 Jan 2029

Xudapu nuclear power plant 2-3 Under construction

Reactor typePressurised water reactor (PWR)
ModelVVER-1200/V-491
Size classLarge
Gross capacity1,274MW
Net capacity1,200MW
Thermal output3,200MWt
Enrichment3–5% U-235
NSSS vendorRosatom
OwnerChina National Nuclear Power Co Ltd100%
OperatorCNNC Liaoning Nuclear Power
Construction start1 May 2021
Commercial operation1 Jan 2027

Xudapu nuclear power plant 2-4 Under construction

Reactor typePressurised water reactor (PWR)
ModelVVER-1200/V-491
Size classLarge
Gross capacity1,274MW
Net capacity1,200MW
Thermal output3,200MWt
Enrichment3–5% U-235
NSSS vendorRosatom
OwnerChina National Nuclear Power Co Ltd100%
OperatorCNNC Liaoning Nuclear Power
Construction start1 May 2021
Commercial operation1 Jan 2028

Xudapu nuclear power plant 3-5 Announced

Reactor typePressurised water reactor (PWR)
Modelnot disclosed
Size classLarge
Gross capacity1,250MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichment3–5% U-235
NSSS vendornot on record
OwnerChina National Nuclear Power Co Ltd100%
OperatorCNNC Liaoning Nuclear Power
Milestonesno dates on record

Xudapu nuclear power plant 3-6 Announced

Reactor typePressurised water reactor (PWR)
Modelnot disclosed
Size classLarge
Gross capacity1,250MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichment3–5% U-235
NSSS vendornot on record
OwnerChina National Nuclear Power Co Ltd100%
OperatorCNNC Liaoning Nuclear Power
Milestonesno dates on record

Xudapu nuclear power plant in context

The nearest other tracked nuclear sites are Hongyanhe nuclear power plant (100 km).

Nearest tracked nuclear sites

SiteCountryDistanceOperating GW gross
Hongyanhe nuclear power plantChina100 km6.7

How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.

Site detail
LocationXudapu, Liaoning, China
Coordinates40.3528, 120.5486
Elevationabout 10 mabove sea level
SettingOn the sea coast, 0.4 km from the water
RegionEastern Asia
Units by status
Under construction: 4
Announced: 2

Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.

Owners & operators
Owners
China National Nuclear Power Co Ltd
Operators
CNNC Liaoning Nuclear Power

Put this plant on your own page: embed a card, or compare it with another plant.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.