Skip to content

Rivne nuclear power plant

Rivne nuclear power plant is a nuclear power station in Ukraine with 4 operating units totalling 2,835 MW gross. The site has 11 units on record in total.

Operating2Retired1circle area ∝ site capacity Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.
Units on record
11
Operating
4
Operating capacity
2,835MW
Country

Units

UnitStatusTypeModelGross MWOnline
Unit 1 Operating PWR VVER V-213 420 1981
Unit 2 Operating PWR VVER V-213 415 1982
Unit 3 Operating PWR VVER V-320 1,000 1987
Unit 4 Operating PWR VVER V-320 1,000 2006
Unit 5 Shelved (inferred) PWR AP-1000 1,250 -
Unit SMR 1 Shelved (inferred) - SMR-160 160 -
Unit SMR 2 Shelved (inferred) - SMR-160 160 -
Unit SMR 3 Shelved (inferred) - SMR-160 160 -
Unit SMR 4 Shelved (inferred) - SMR-160 160 -
Unit SMR 5 Shelved (inferred) - SMR-160 160 -
Unit SMR 6 Shelved (inferred) - SMR-160 160 -

Unit by unit

Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.

Rivne nuclear power plant 1 Operating

Reactor typePressurised water reactor (PWR)
ModelVVER V-213
Size classLarge
Gross capacity420MW
Net capacity381MW
Thermal output1,375MWt
Enrichment3–5% U-235
NSSS vendorRosatom
OwnerSE NNEGC "Energoatom"100%
OperatorSE NNEGC "Energoatom"
Construction start1 Aug 1973
First criticality17 Dec 1980
Grid connection22 Dec 1980
Commercial operation22 Sep 1981

Rivne nuclear power plant 2 Operating

Reactor typePressurised water reactor (PWR)
ModelVVER V-213
Size classLarge
Gross capacity415MW
Net capacity376MW
Thermal output1,375MWt
Enrichment3–5% U-235
NSSS vendorRosatom
OwnerSE NNEGC "Energoatom"100%
OperatorSE NNEGC "Energoatom"
Construction start1 Oct 1973
First criticality19 Dec 1981
Grid connection22 Dec 1981
Commercial operation29 Jul 1982

Rivne nuclear power plant 3 Operating

Reactor typePressurised water reactor (PWR)
ModelVVER V-320
Size classLarge
Gross capacity1,000MW
Net capacity950MW
Thermal output3,000MWt
Enrichment3–5% U-235
NSSS vendorRosatom
OwnerSE NNEGC "Energoatom"100%
OperatorSE NNEGC "Energoatom"
Construction start1 Feb 1980
First criticality11 Nov 1986
Grid connection21 Dec 1986
Commercial operation16 May 1987

Rivne nuclear power plant 4 Operating

Reactor typePressurised water reactor (PWR)
ModelVVER V-320
Size classLarge
Gross capacity1,000MW
Net capacity950MW
Thermal output3,000MWt
Enrichment3–5% U-235
NSSS vendorRosatom
OwnerSE NNEGC "Energoatom"100%
OperatorSE NNEGC "Energoatom"
Construction start1 Aug 1986
First criticality26 Sep 2004
Grid connection10 Oct 2004
Commercial operation6 Apr 2006

Rivne nuclear power plant 5 Shelved (inferred)

Reactor typePressurised water reactor (PWR)
ModelAP-1000
Size classLarge
Gross capacity1,250MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichment3–5% U-235
NSSS vendorWestinghouse Electric Company
OwnerSE NNEGC "Energoatom"100%
OperatorSE NNEGC "Energoatom"
Milestonesno dates on record

Rivne nuclear power plant SMR 1 Shelved (inferred)

Reactor typesmall modular reactor
ModelSMR-300
Size classSmall
Gross capacity160MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichmentnot established
NSSS vendornot on record
OwnerSE NNEGC "Energoatom"100%
Milestonesno dates on record

Rivne nuclear power plant SMR 2 Shelved (inferred)

Reactor typesmall modular reactor
ModelSMR-300
Size classSmall
Gross capacity160MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichmentnot established
NSSS vendornot on record
OwnerSE NNEGC "Energoatom"100%
Milestonesno dates on record

Rivne nuclear power plant SMR 3 Shelved (inferred)

Reactor typesmall modular reactor
ModelSMR-300
Size classSmall
Gross capacity160MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichmentnot established
NSSS vendornot on record
OwnerSE NNEGC "Energoatom"100%
Milestonesno dates on record

Rivne nuclear power plant SMR 4 Shelved (inferred)

Reactor typesmall modular reactor
ModelSMR-300
Size classSmall
Gross capacity160MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichmentnot established
NSSS vendornot on record
OwnerSE NNEGC "Energoatom"100%
Milestonesno dates on record

Rivne nuclear power plant SMR 5 Shelved (inferred)

Reactor typesmall modular reactor
ModelSMR-300
Size classSmall
Gross capacity160MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichmentnot established
NSSS vendornot on record
OwnerSE NNEGC "Energoatom"100%
Milestonesno dates on record

Rivne nuclear power plant SMR 6 Shelved (inferred)

Reactor typesmall modular reactor
ModelSMR-300
Size classSmall
Gross capacity160MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichmentnot established
NSSS vendornot on record
OwnerSE NNEGC "Energoatom"100%
Milestonesno dates on record

Rivne nuclear power plant in context

By gross operating capacity Rivne nuclear power plant is the 3rd largest of 4 operating nuclear sites in Ukraine, holding 20% of the country's operating capacity, and ranks 44th of 172 worldwide.

Its operating units started up between 1981 and 2006; the median unit is 41.5 years old, older than the median of 39.0 in Ukraine.

The 4 units with both construction and grid dates on record took 6.9 to 18.2 years (median 7.8) from construction start to grid connection; the median across all reactors connected in the 1980s is 7.3 years.

The nearest other tracked nuclear sites are Khmelnitski nuclear power plant (125 km).

2 operating units are rated differently now from their design net capacities: Unit 1 +5.5% and Unit 2 -2.1%.

Build time by unit

UnitConstruction startGrid connectionYearsFleet median, same decade
Unit 1197319807.47.3 (1980s)
Unit 2197319818.27.3 (1980s)
Unit 3198019866.97.3 (1980s)
Unit 41986200418.26.8 (2000s)

Nearest tracked nuclear sites

SiteCountryDistanceOperating GW gross
Khmelnitski nuclear power plantUkraine125 km2.0

How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.

Site detail
LocationRivnenska, Ukraine
Coordinates51.3245, 25.8974
Elevationabout 190 mabove sea level
SettingAbout 520 km from the sea
RegionEastern Europe
Units by status
Operating: 4
Shelved: 7

Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.

Owners & operators
Owners
SE NNEGC "Energoatom"
Operators
SE NNEGC "Energoatom"

Put this plant on your own page: embed a card, or compare it with another plant.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try