Bilibino nuclear power plant is a nuclear site in Russia with 4 units on record. None is currently operating.

Under construction1Retired1circle area ∝ site capacitydashed = approximate position Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.
Units on record
4
Operating
0
Operating capacity
not disclosed
Country

Units

UnitStatusTypeModelGross MWOnline
Unit 1 Retired LWGR EGP-6 12 1974
Unit 2 Retired LWGR EGP-6 12 1975
Unit 3 Retired LWGR EGP-6 12 1976
Unit 4 Retired LWGR EGP-6 12 1977

Unit by unit

Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.

Bilibino nuclear power plant 1 Retired

Reactor typeLight water graphite reactor (LWGR)
ModelEGP-6
Size classVery small
Gross capacity12MW
Net capacity11MW
Thermal output62MWt
Enrichment2–2.6% U-235
NSSS vendornot on record
OwnerRosatom100%
OperatorRosenergoatom
Construction start1 Jan 1970
First criticality11 Dec 1973
Grid connection12 Jan 1974
Commercial operation1 Apr 1974
Permanent shutdown14 Jan 2019

Bilibino nuclear power plant 2 Retired

Reactor typeLight water graphite reactor (LWGR)
ModelEGP-6
Size classVery small
Gross capacity12MW
Net capacity11MW
Thermal output62MWt
Enrichment2–2.6% U-235
NSSS vendornot on record
OwnerRosatom100%
OperatorRosenergoatom
Construction start1 Jan 1970
First criticality7 Dec 1974
Grid connection30 Dec 1974
Commercial operation1 Feb 1975
Permanent shutdown1 Dec 2025

Bilibino nuclear power plant 3 Retired

Reactor typeLight water graphite reactor (LWGR)
ModelEGP-6
Size classVery small
Gross capacity12MW
Net capacity11MW
Thermal output62MWt
Enrichment2–2.6% U-235
NSSS vendornot on record
OwnerRosatom100%
OperatorRosenergoatom
Construction start1 Jan 1970
First criticality6 Dec 1975
Grid connection22 Dec 1975
Commercial operation1 Feb 1976
Permanent shutdown19 Dec 2025

Bilibino nuclear power plant 4 Retired

Reactor typeLight water graphite reactor (LWGR)
ModelEGP-6
Size classVery small
Gross capacity12MW
Net capacity11MW
Thermal output62MWt
Enrichment2–2.6% U-235
NSSS vendornot on record
OwnerRosatom100%
OperatorRosenergoatom
Construction start1 Jan 1970
First criticality12 Dec 1976
Grid connection27 Dec 1976
Commercial operation1 Jan 1977
Permanent shutdown30 Dec 2025

Bilibino nuclear power plant in context

The 4 units with both construction and grid dates on record took 4.0 to 7.0 years (median 5.5) from construction start to grid connection; the median across all reactors connected in the 1970s is 5.4 years.

The nearest other tracked nuclear sites are Akademik Lomonosov nuclear power plant (238 km).

Build time by unit

UnitConstruction startGrid connectionYearsFleet median, same decade
Unit 1197019744.05.4 (1970s)
Unit 2197019745.05.4 (1970s)
Unit 3197019756.05.4 (1970s)
Unit 4197019767.05.4 (1970s)

Nearest tracked nuclear sites

SiteCountryDistanceOperating GW gross
Akademik Lomonosov nuclear power plantRussia238 km0.1

How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.

Site detail
LocationChukotka, Russia
Coordinates68.0503, 166.5389
Elevationabout 325 mabove sea level
SettingAbout 150 km from the sea
RegionEastern Europe
Units by status
Retired: 4

Elevation is read at the listed coordinates from a 30 m terrain model (ASTER GDEM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.

Owners & operators
Owners
Rosatom
Operators
Rosenergoatom

Put this plant on your own page: embed a card, or compare it with another plant.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.