Skip to content
nuclearchain

Aurora

Output
15MWe

Aurora is a liquid metal-cooled reactor design from Oklo Inc. rated at 15 MWe. An application is docketed and under active regulatory review. It requires HALEU fuel.

Worth reading as a cautionary tale about announcement-versus-regulation. Oklo's first combined licence application was **denied** by the NRC in 2022 for insufficient information — the only outright denial in this pipeline. The current application follows a completed pre-application readiness assessment. A company can have many announced sites and still not have a licence.

Regulatory position
Tier Under review
RegulatorUS NRC
Application typeCombined licence
Docket / referenceNRC combined licence application, Aurora-INL
Application date
Review phaseCombined licence application accepted for review
Decision expectednot stated
Design
CoolantLiquid metal
Reactor familyFast reactor (FBR)
Electrical output15MWe
Thermal outputnot disclosed
FuelMetallic uranium
Enrichment HALEUUp to 19.75% U-235
First siteIdaho National Laboratory
Offtakersnone announced
Fuel supply for this design

This design needs HALEU — uranium enriched above 5% and below 20%. That is not the fuel any commercial Western power reactor uses today, and it is the single most common reason an advanced reactor timeline slips. Every Western facility that can make it or turn it into fuel:

FacilityCapacityStatus
TRISO-X Fuel Facility (TX-1), Oak Ridge not disclosed construction
American Centrifuge Plant, Piketon 900kg HALEU/yr operating
Nuclear Fuel Services, Erwin not disclosed operating
Savannah River Site HEU downblending 3,100kg HALEU total operating
BWXT TRISO facility, Gillette not disclosed planned
Urenco Capenhurst HALEU line not disclosed planned

Sources