Skip to content
nuclearchain

ARC-100

Pre-application HALEU dependency
Output
100MWe

ARC-100 is a liquid sodium-cooled reactor design rated at 100 MWe. The developer is engaging a regulator but has not submitted an application. It requires HALEU fuel.

What would have to be true

A CNSC Vendor Design Review is explicitly not a licensing decision — it is a pre-licensing opinion on whether a design could in principle be licensed. NB Power would need to apply for a licence to construct, and a HALEU supply would need to exist.

Derived from the EBR-II sodium fast reactor that operated at Idaho for three decades, which gives it more operating heritage than most entries at this tier.

Regulatory position
Tier Pre-application
RegulatorCNSC (Canada)
Application typeVendor Design Review
Docket / referenceCNSC Vendor Design Review Phase 2, completed July 2025
Application date
Review phaseVDR Phase 2 complete; no construction licence application
Decision expectednot stated
Design
CoolantLiquid sodium
Reactor familyFast reactor (FBR)
Electrical output100MWe
Thermal outputnot disclosed
FuelMetallic uranium
Enrichment HALEU
First sitePoint Lepreau, New Brunswick
Offtakersnone announced
Fuel supply for this design

This design needs HALEU — uranium enriched above 5% and below 20%. That is not the fuel any commercial Western power reactor uses today, and it is the single most common reason an advanced reactor timeline slips. Every Western facility that can make it or turn it into fuel:

FacilityCapacityStatus
TRISO-X Fuel Facility (TX-1), Oak Ridge not disclosed construction
American Centrifuge Plant, Piketon 900kg HALEU/yr operating
Nuclear Fuel Services, Erwin not disclosed operating
Savannah River Site HEU downblending 3,100kg HALEU total operating
BWXT TRISO facility, Gillette not disclosed planned
Urenco Capenhurst HALEU line not disclosed planned