Skip to content
nuclearchain

River Bend nuclear power plant 3

Cancelled United States
Gross capacity
1,520MW

River Bend nuclear power plant 3 is a boiling water reactor unit at River Bend nuclear power plant in United States rated at 1,520 MW gross. It is cancelled.

Specification
Reactor type Boiling water reactor (BWR)
Modelnot disclosed
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity1,520MW
Net capacity (reference)not disclosed
Net capacity (design)not disclosed
Thermal outputnot disclosed
Typical enrichment3–5% U-235
Ownership & location
SiteRiver Bend nuclear power plant
Unit3
CountryUnited States
OwnerGulf States Utilities Co100%
Coordinates 30.7570, -91.3327
Cancelled2015
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Other units at River Bend nuclear power plant

UnitStatusGross MW
River Bend nuclear power plant 1 Operating 1,016
River Bend nuclear power plant 2 Cancelled 934

Sources