Skip to content
nuclearchain

Leningrad nuclear power plant 2-2

Operating Russia
Gross capacity
1,188MW

Leningrad nuclear power plant 2-2 is a pressurised water reactor unit at Leningrad nuclear power plant in Russia rated at 1,188 MW gross. It is operating. Commercial operation began 18 Mar 2021.

Specification
Reactor type Pressurised water reactor (PWR)
ModelVVER V-491
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity1,188MW
Net capacity (reference)1,101MW
Net capacity (design)1,066MW
Thermal output3,200MWt
Typical enrichment3–5% U-235
Ownership & location
SiteLeningrad nuclear power plant
Unit2-2
CountryRussia
OwnerRosatom100%
OperatorRosenergoatom
Coordinates 59.8525, 29.0486
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 15 Apr 2010Construction start
  2. 29 Aug 2020First criticality
  3. 22 Oct 2020Grid connection
  4. 18 Mar 2021Commercial operation

Other units at Leningrad nuclear power plant

Other VVER V-491 units

4 units worldwide share this model designation.

UnitCountryStatusGross MW
Astravets nuclear power plant 1 Belarus Operating 1,194
Astravets nuclear power plant 2 Belarus Operating 1,194
Leningrad nuclear power plant 2-1 Russia Operating 1,188

Sources