Chernobyl nuclear power plant 3

Retired Ukraine
Gross capacity
1,000MW

Chernobyl nuclear power plant 3 is a light water graphite reactor unit at Chernobyl nuclear power plant in Ukraine rated at 1,000 MW gross. It is retired. Commercial operation began 8 Jun 1982.

Specification
Reactor type Light water graphite reactor (LWGR)
ModelRBMK
Size classLarge
CoolantLight water
ModeratorGraphite
Gross capacity1,000MW
Net capacity (reference)925MW
Net capacity (design)925MW
Thermal output3,200MWt
Typical enrichment2–2.6% U-235
Ownership & location
SiteChernobyl nuclear power plant
Unit3
CountryUkraine
OwnerSE NNEGC "Energoatom"100%
OperatorMintopenergo Of Ukraine
Coordinates 51.3894, 30.1007
Fuel chain for this unit
Fuel form
Slightly enriched uranium dioxide in pressure tubes
Enrichment
2–2.6% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Mar 1976Construction start
  2. 2 Jun 1981First criticality
  3. 3 Dec 1981Grid connection
  4. 8 Jun 1982Commercial operation
  5. 15 Dec 2000Permanent shutdown

Other units at Chernobyl nuclear power plant

Other RBMK units

6 units worldwide share this model designation.

UnitCountryStatusGross MW
Chernobyl nuclear power plant 1 Ukraine Retired 800
Chernobyl nuclear power plant 2 Ukraine Retired 1,000
Chernobyl nuclear power plant 4 Ukraine Retired 1,000
Chernobyl nuclear power plant 5 Ukraine Cancelled 1,000
Chernobyl nuclear power plant 6 Ukraine Cancelled 1,000

Sources