Skip to content
nuclearchain

Chernobyl nuclear power plant 2

Retired Ukraine
Gross capacity
1,000MW

Chernobyl nuclear power plant 2 is a light water graphite reactor unit at Chernobyl nuclear power plant in Ukraine rated at 1,000 MW gross. It is retired. Commercial operation began 28 May 1979.

Specification
Reactor type Light water graphite reactor (LWGR)
ModelRBMK
Size classLarge
CoolantLight water
ModeratorGraphite
Gross capacity1,000MW
Net capacity (reference)925MW
Net capacity (design)925MW
Thermal output3,200MWt
Typical enrichment2–2.6% U-235
Ownership & location
SiteChernobyl nuclear power plant
Unit2
CountryUkraine
OwnerSE NNEGC "Energoatom"100%
OperatorMintopenergo Of Ukraine
Coordinates 51.3894, 30.1047
Fuel chain for this unit
Fuel form
Slightly enriched uranium dioxide in pressure tubes
Enrichment
2–2.6% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Feb 1973Construction start
  2. 17 Nov 1978First criticality
  3. 21 Dec 1978Grid connection
  4. 28 May 1979Commercial operation
  5. 11 Oct 1991Permanent shutdown

Other units at Chernobyl nuclear power plant

Other RBMK units

6 units worldwide share this model designation.

UnitCountryStatusGross MW
Chernobyl nuclear power plant 1 Ukraine Retired 800
Chernobyl nuclear power plant 3 Ukraine Retired 1,000
Chernobyl nuclear power plant 4 Ukraine Retired 1,000
Chernobyl nuclear power plant 5 Ukraine Cancelled 1,000
Chernobyl nuclear power plant 6 Ukraine Cancelled 1,000

Sources