Skip to content
nuclearchain

Novovoronezh nuclear power plant 1-3

Retired Russia
Gross capacity
417MW

Novovoronezh nuclear power plant 1-3 is a pressurised water reactor unit at Novovoronezh nuclear power plant in Russia rated at 417 MW gross. It is retired. Commercial operation began 29 Jun 1972.

Specification
Reactor type Pressurised water reactor (PWR)
ModelVVER V-179
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity417MW
Net capacity (reference)385MW
Net capacity (design)385MW
Thermal output1,375MWt
Typical enrichment3–5% U-235
Ownership & location
SiteNovovoronezh nuclear power plant
Unit1-3
CountryRussia
OwnerRosatom100%
OperatorRosenergoatom
Coordinates 51.2668, 39.2151
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jul 1967Construction start
  2. 22 Dec 1971First criticality
  3. 27 Dec 1971Grid connection
  4. 29 Jun 1972Commercial operation
  5. 25 Dec 2016Permanent shutdown

Other units at Novovoronezh nuclear power plant

Other VVER V-179 units

2 units worldwide share this model designation.

UnitCountryStatusGross MW
Novovoronezh nuclear power plant 1-4 Russia Operating 417

Sources