Changjiang nuclear power plant 2

Operating China
Gross capacity
650MW

Changjiang nuclear power plant 2 is a pressurised water reactor unit at Changjiang nuclear power plant in China rated at 650 MW gross. It is operating. Commercial operation began 12 Aug 2016.

Specification
Reactor type Pressurised water reactor (PWR)
ModelCNP-600
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity650MW
Net capacity (reference)601MW
Net capacity (design)601MW
Thermal output1,930MWt
Typical enrichment3–5% U-235
Ownership & location
SiteChangjiang nuclear power plant
Unit2
CountryChina
OwnerHuaneng Nuclear Power Development Co Ltd100%
OperatorHuaneng Hainan Changjiang Nuclear Power
Coordinates 19.4591, 108.8963
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 21 Nov 2010Construction start
  2. 9 Jun 2016First criticality
  3. 20 Jun 2016Grid connection
  4. 12 Aug 2016Commercial operation

Other units at Changjiang nuclear power plant

UnitStatusGross MW
Changjiang nuclear power plant 1 Operating 650
Changjiang nuclear power plant 3 Under construction 1,198
Changjiang nuclear power plant 4 Under construction 1,200

Other CNP-600 units

6 units worldwide share this model designation.

UnitCountryStatusGross MW
Changjiang nuclear power plant 1 China Operating 650
Qinshan nuclear power plant 2-1 China Operating 670
Qinshan nuclear power plant 2-2 China Operating 708
Qinshan nuclear power plant 2-3 China Operating 670
Qinshan nuclear power plant 2-4 China Operating 670

Sources