Boiling Nuclear Superheater (BONUS) nuclear power plant
Retired Puerto Rico
Gross capacity
18MW
Boiling Nuclear Superheater (BONUS) nuclear power plant is a boiling water reactor unit at Boiling Nuclear Superheater (BONUS) nuclear power plant in Puerto Rico rated at 18 MW gross. It is retired. Commercial operation began 1 Sep 1965.
Specification
| Reactor type | Boiling water reactor (BWR) |
|---|---|
| Model | Superheater |
| Size class | Large |
| Coolant | Light water |
| Moderator | Light water |
| Gross capacity | 18MW |
| Net capacity (reference) | 17MW |
| Net capacity (design) | 17MW |
| Thermal output | 50MWt |
| Typical enrichment | 3–5% U-235 |
Ownership & location
| Site | Boiling Nuclear Superheater (BONUS) nuclear power plant |
|---|---|
| Unit | not stated |
| Country | Puerto Rico |
| Owner | US DOE and Puerto Rico Electric Power Authority100% |
| Operator | US Department of Energy Puerto Rico Water Resources |
| Coordinates | 18.3652, -67.2687 |
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
- Framatome BWR fuel assemblies
- Global Nuclear Fuel BWR fuel assemblies
- Westinghouse Electric Company BWR fuel assemblies
Upstream
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Fabricator capability is recorded against reactor type and model line, not against named units —
utilities do not publish fuel contracts. See the fuel chain.
Timeline
- 1 Jan 1960Construction start
- 13 Apr 1964First criticality
- 14 Aug 1964Grid connection
- 1 Sep 1965Commercial operation
- 1 Jun 1968Permanent shutdown
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release — CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-20
- GEM.wiki entry (further reading) — CC BY-SA 4.0 — linked, not quoted