Taechon nuclear power plant
Cancelled North Korea
Gross capacity
200MW
Taechon nuclear power plant is a gas-cooled reactor unit at Taechon nuclear power plant in North Korea rated at 200 MW gross. It is cancelled. Construction started 1 Jan 1989.
Specification
| Reactor type | Gas-cooled reactor (GCR) |
|---|---|
| Model | not disclosed |
| Size class | Large |
| Coolant | Carbon dioxide |
| Moderator | Graphite |
| Gross capacity | 200MW |
| Net capacity (reference) | not disclosed |
| Net capacity (design) | not disclosed |
| Thermal output | 800MWt |
| Typical enrichment | Natural uranium to 2.5–3.5% U-235 |
Ownership & location
| Site | Taechon nuclear power plant |
|---|---|
| Unit | not stated |
| Country | North Korea |
| Coordinates | 39.9277, 125.5694 |
| Cancelled | 1994 |
Fuel chain for this unit
Fuel form
Uranium metal (Magnox) or uranium dioxide (AGR)
Enrichment
Natural uranium to 2.5–3.5% U-235 no enrichment required
Upstream
This unit runs on natural uranium, so its fuel chain has no enrichment step at all: mine → mill → conversion → fabrication. That is the shortest fuel chain of any commercial reactor type, and it makes the operator independent of the four organisations that control enrichment worldwide.
Fabricator capability is recorded against reactor type and model line, not against named units —
utilities do not publish fuel contracts. See the fuel chain.
Timeline
- 1 Jan 1989Construction start
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release — CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-09
- GEM.wiki entry (further reading) — CC BY-SA 4.0 — linked, not quoted